A lighter approach to the future
– 8 CAD-CAM workstations
– 5 cutting machines ZUND
– 2 additional machines in 2024.
– 78 Industry 4.0 layup stations with time tracking to ensure 100% traceability.of operations performed (layup, compaction, vacuuming, etc.)
– 20 additional workstations in 2024.
– 2 AUTOCLAVES – 2600mm x 8000mm – 6 bar / 200°C– 2 AUTOCLAVES – 2000mm x 4000mm – 6 bar / 200°C
– 1 AUTOCLAVE – 2600mm x 8000mm – 6 bar / 200°C
– 1 additional AUTOCLAVE – 2600mm x 8000mm – 6 bar / 200°C in 2024.
– 1 additional AUTOCLAVE – 2000mm x 4000mm – 6 bar / 200°C in 2024.
Trimming: – 10 manual trimming stations – 4 robotic cells
Equipment: – 1 CNC – 5-axis – 6500mm x 3000mm x 2000mm – 1 CNC – 5-axis – 4500mm x 1780mm x 1400mm
– 3 bonding ovens 2000 x 4000 x 2000mm – 2 bonding ovens 2000 x 2000 x 2000mm – 2 adhesive application control systems
100% of bonded assemblies are then cured in an oven.
– 3 paint booths – 4000 x 8000 x 3000mm – 8 sanding booths – 4000 x 8000 x 3000 mmPainting and varnishing process according to OEM standards.
– 2 inspection machines 2500 x 3000 x 1500mm with METROLOG software
NEED INFORMATION?
By submitting your request via our form